Logistics

Optimization of the Prologis warehouses in Moissy-Cramayel - 20,000 m²

Optimized surface ➡️ 20,000 m² spread over 2 warehouses

Reference energy ➡️ Gas

-70%

energy savings

-70%

reduction in CO2 emissions

Background

 

In 2021, Prologis, an international player in logistics and industrial real estate, called on Accenta to reduce the energy consumption and CO2 emissions of 2 warehouses located in its logistics park in Moissy-Cramayel.

The mission consists of replacing the old gas heating system with clean and economical low-carbon equipment.

 

 

Customized solutions from Accenta

 

Following the preliminary study carried out on the site, the project owner opted for the installation of a Smart BMS platform. The system includes:

✅ Replacement of boilers, circulation pumps and control cabinets
✅ Desludging of the distribution network and installation of a desludging device
✅ Installation of the GTB infrastructure
✅ Configuration and deployment of hypervision through the software:
Effipilot to optimize demand and equipment shutdowns/restarts based on climatic and building usage constraints
Insight to monitor consumption, CO2 emissions and the energy budget

 

 

Customer benefits

 

✅ The 2 Prologis warehouses now consume respectively – 66% and – 78% of energy and CO2 compared to a standard gas solution, i.e. an average of – 70%
✅ They now achieve an average saving of – 73% on the heating budget
✅ A response to the regulatory obligations of the BACS decree and the tertiary decree
✅ Improving the thermal comfort of the site’s employees
✅ Simple heating management, which can be carried out remotely on a PC and smartphone using a personalized interface
✅ An increase in the land value of the equipped buildings thanks to their new energy efficiency label

Energy management has entered a new era!